Thursday, June 27, 2013

WoodenBoat Show Eve

Well, it's WoodenBoat Show Eve, when all of us trolls emerge from our shop caves to glory in our art.  For my own part, I've been welding and fitting sub-deck structure since the last post - things that are not photogenic, which hopefully explains the dearth of updates.

To whet one's appetite, go here for show information.  See you at the show!

Saturday, April 27, 2013

Boiler Erection

Here's something new.  This is the shell of the boiler for the launch.  The perspective is looking at the bottom of the barrel - it's a scotch marine - the coupling front and center is the blowdown.  The hand hole to port is for bottom wash and clean-out.  On the inside one can see the cluster of four outlets that make up the two safeties, whistle and auxiliary.  The main and throttle are further forward.  They'll have a drypipe fitted later.  The starboard upper hand hole is for washing the tubes.  Not bored yet are the feedwater inlets and the other two 1.5 wash-out holes.  This is a certified build and will receive an "S" stamp when it is complete.  Sorry about the quality of the photo - camera phone.


Monday, April 8, 2013

Spring!

I throw open the shop doors!  I thought it would never get here.  Now things can cure without heat lamps and what not.

I glued in No. 1 bulkhead this past Saturday morning.


Here's the view from the front.  The little block in front of the feedwater tank supports is a mast step.  Why a mast step?  I don't know, some day I may want to add a fore mast.  How else would one rig ship for holidays, etc.?  I'll sand the fillets after they fully cure and blend the paint.


Tuesday, April 2, 2013

Interior Painting & Sanding

Painting and sanding all of the parts that one won't see.  But it's all about protecting the composite finish and making it easier to clean.  This picture was taken with my phone camera, so the lines are a little distorted.  One can see the first coats of Grand Banks Beige in the counter stern and extending forward from bulkhead No. 5.  Bulkhead No. 1 still isn't glued in yet as I finish up things in the forepeak that would be more difficult to do later.


Tuesday, March 12, 2013

Fitting the last bulkhead, No. 1.  That's finish paint up in the fore peak.  Now the blog is almost up to date.


Fitting out the interior.  Here, the floors and engine bed supports are going in.


By Christmas Eve 2012, all of the floors were in.  The curved ones are to clear boiler jacketing.  The cross brace on No. 2 stays in to stabilize the topsides until the deck is on.


Fitting up pump crosshead links.