Fitting out the interior. Here, the floors and engine bed supports are going in.
By Christmas Eve 2012, all of the floors were in. The curved ones are to clear boiler jacketing. The cross brace on No. 2 stays in to stabilize the topsides until the deck is on.
No comments:
Post a Comment