It feels like some kind of initiation ritual with holy symbols ...
This is the NBIC symbol, stamped in front of the serial number ...
Higher up in the pantheon, surrounded by the great cloud of information such as manufacturer, square footage of heating surface and steaming capacity, we stamped this ...
The ASME symbol, with an "S" below it.
No bottled goods were broke over the shell of the boiler, but it is still exciting. I mean, who gets to attend a boiler stamping these days?
Ceremony over, we poured over the P-2 form, more painful than federal taxes, in order to make sure that every "i" was dotted and "t" was crossed.
I am told that the reviewers on the Board are humorless ...
Now on to the Commonwealth's Department of Labor & Industry, Boiler Division ...
Thursday, June 12, 2014
Tuesday, June 10, 2014
A Propeller Shaft for Iona
Walking out to get the mail I noticed the tell-tale tire tracks of the UPS truck. Oh! Maybe it's the shaft! Sure enough, propped inside the shop door - the delivery man is well-trained - stands the new shaft in its tube. Soon it is out of its packing and I'm checking the specs and fit. This is good ...
Here is the shaft poking through the gland. The keyway for the coupling is clearly visible on the top. Since the gland with its O-rings floats in the stern tube, I loosen all of the bronze machine screws that fasten it to the tube and slowly torque them in the pattern that is best centered on the shaft. It rotates freely. The packing nut is on the gland though the packing has yet to be laid in.
Here's a shot of the interior with the shaft protruding forward. The locking nut for the gland is on a seat support. The wide angle lens of the camera makes the launch look like a barge. The first coat of the interior paint is down - Interlux Grand Banks Beige. I used this paint since it will be kind on the eyes and easy to freshen up before each season. Though as one can see, it will mostly be under floorboards and seats. The bilge will stay bright white epoxy for ease of suging.
Here's the shaft protruding from the cutless bearing. I'm still deciding whether to use low-heat epoxy to bond the bearing in or the time-honored set screws. After we make up our mind about that, I'll finish touching up the copper bottom paint. Then, after the packing is set up, it will be time for a float test!
...
It's almost Boiler Inspection Eve. Saturday, the three boilers were plumbed in series in preparation for the official hydro and inspection. All three are wearing their blowdowns. Mine is last in the series with the air vent and the gauge. And yes, reasonable people could differ about the placement of the blowdown - pressure on the bonnet and the packing - what is this world coming to?
All three were brought up to 300 psi to test the rig; no troubling leaks.
Here is the shaft poking through the gland. The keyway for the coupling is clearly visible on the top. Since the gland with its O-rings floats in the stern tube, I loosen all of the bronze machine screws that fasten it to the tube and slowly torque them in the pattern that is best centered on the shaft. It rotates freely. The packing nut is on the gland though the packing has yet to be laid in.
Here's a shot of the interior with the shaft protruding forward. The locking nut for the gland is on a seat support. The wide angle lens of the camera makes the launch look like a barge. The first coat of the interior paint is down - Interlux Grand Banks Beige. I used this paint since it will be kind on the eyes and easy to freshen up before each season. Though as one can see, it will mostly be under floorboards and seats. The bilge will stay bright white epoxy for ease of suging.
Here's the shaft protruding from the cutless bearing. I'm still deciding whether to use low-heat epoxy to bond the bearing in or the time-honored set screws. After we make up our mind about that, I'll finish touching up the copper bottom paint. Then, after the packing is set up, it will be time for a float test!
...
It's almost Boiler Inspection Eve. Saturday, the three boilers were plumbed in series in preparation for the official hydro and inspection. All three are wearing their blowdowns. Mine is last in the series with the air vent and the gauge. And yes, reasonable people could differ about the placement of the blowdown - pressure on the bonnet and the packing - what is this world coming to?
All three were brought up to 300 psi to test the rig; no troubling leaks.
Sunday, June 1, 2014
Engine Beds
While waiting for the official boiler inspection to come around on the calendar, work continues apace on the hull. The first photo shows the hull higher up on boat stands. With rudder, skeg and propeller work in the near future, I needed to get the hull higher off the shop floor -
Spiders and silverfish were sent scurrying as the engine lift raised first one end and then the other as I followed with the jackstands. The previous weekend I had gotten the engine beds out of some old-growth Doug fir I had lying around - actually leftovers from the stem piece. Here, my heart is in my throat as I lift the uncompleted compound over the gunwales and down to the beds:
The object of the exercise is to dial in the fit for the propeller shaft. Once the shaft is installed, further fitting of the beds may be pursued. The engine swings down into place ...
The tenons of the beds are plainly seen in No. 3 floor. The beds are just sitting in there since they will have to be planed and jiggered quite a bit. Almost there ...
Ahh ...
Once on the beds, I get to work sliding the engine aft and positioning the story stick in the shaft log for calculating coupling lengths, propeller clearances, etc. How does SAE 755 go again? So much to remember ... Here's a shot of the stick in place and my rule checking on clearances for the engine pumps. I had planned for all of this previously when laying out the shaft log angle, bed supports, etc. Still it is gratifying to see it all work out with the actual hardware. At this point, the beds are still 0.125" high from the plane of the shaft log. Pitch and roll on the beds remains to be dialed in, too.
The starboard bed is too thick and does not permit much lateral adjustment. The engine is hoisted to take weight, out comes the plane and then the bed is tapped back into place. Good, now there's more room. The story stick has been replaced by a 1.25" dowel just to see how far we're off. Final adjustment won't come until the shaft and couplings are in place, with a final review afloat in case the hull flexes in displacement.
Spiders and silverfish were sent scurrying as the engine lift raised first one end and then the other as I followed with the jackstands. The previous weekend I had gotten the engine beds out of some old-growth Doug fir I had lying around - actually leftovers from the stem piece. Here, my heart is in my throat as I lift the uncompleted compound over the gunwales and down to the beds:
The object of the exercise is to dial in the fit for the propeller shaft. Once the shaft is installed, further fitting of the beds may be pursued. The engine swings down into place ...
The tenons of the beds are plainly seen in No. 3 floor. The beds are just sitting in there since they will have to be planed and jiggered quite a bit. Almost there ...
Ahh ...
Once on the beds, I get to work sliding the engine aft and positioning the story stick in the shaft log for calculating coupling lengths, propeller clearances, etc. How does SAE 755 go again? So much to remember ... Here's a shot of the stick in place and my rule checking on clearances for the engine pumps. I had planned for all of this previously when laying out the shaft log angle, bed supports, etc. Still it is gratifying to see it all work out with the actual hardware. At this point, the beds are still 0.125" high from the plane of the shaft log. Pitch and roll on the beds remains to be dialed in, too.
The starboard bed is too thick and does not permit much lateral adjustment. The engine is hoisted to take weight, out comes the plane and then the bed is tapped back into place. Good, now there's more room. The story stick has been replaced by a 1.25" dowel just to see how far we're off. Final adjustment won't come until the shaft and couplings are in place, with a final review afloat in case the hull flexes in displacement.
Sunday, May 4, 2014
Putting on the Squeeze
I thought the day would never get here. I am referring of course to the hydrostatic test of Iona's boiler. A boiler needs to hold pressure and do so without leaking. Steam leaks are pesky, debilitating things. Plus on Inspection Day, the Authorized Inspector wants to see a vessel quietly sitting there holding 150 percent of working pressure, without fuss.
The boiler was set up on pipe horses and the various fittings and hydrostatic pump applied. The furnace received heat for the first time in the form of an oxy-acetylene torch in order to bring vessel and water temperature up to 70 F.
Here's the boiler front with a vent fitting on the starboard lower 1.5" washout plug hole. The port lower handhole fitting is seen to the right. The boiler is sitting here with 300 psi on it. I am pleased ... The boiler is in the august company of a main driving wheelset for a ten-wheeler, for those who must know.
The combustion chamber end had three weepers, hence the puddle. They quickly took up with a few turns of the tube roller.
Meanwhile, as the vessel was sitting there, I assisted colleague Mr. Anderson with his new launch ...
This is a Baird hull that Mr. Anderson acquired. We were finding its center of gravity for a trailer he wants built for it. The plan is then, that the trailer it is sitting on will become Iona's trailer. Our shop's overhead cranes and giant scale were employed in this exercise. We look forward to see Mr. Anderson's meticulous transformation of this launch.
Of course, I couldn't resist weighing Iona's boiler while full of water. It came in at an even 1,000 lbs. This is good; we feared that we would have to ballast Iona's box keel with some lead pigs. This weight takes care of that.
Here's a last shot of the test gauge - sort of a blurry camera phone image - sitting just below 300 psi.
Gratification.
The boiler was set up on pipe horses and the various fittings and hydrostatic pump applied. The furnace received heat for the first time in the form of an oxy-acetylene torch in order to bring vessel and water temperature up to 70 F.
Here's the boiler front with a vent fitting on the starboard lower 1.5" washout plug hole. The port lower handhole fitting is seen to the right. The boiler is sitting here with 300 psi on it. I am pleased ... The boiler is in the august company of a main driving wheelset for a ten-wheeler, for those who must know.
The combustion chamber end had three weepers, hence the puddle. They quickly took up with a few turns of the tube roller.
Meanwhile, as the vessel was sitting there, I assisted colleague Mr. Anderson with his new launch ...
This is a Baird hull that Mr. Anderson acquired. We were finding its center of gravity for a trailer he wants built for it. The plan is then, that the trailer it is sitting on will become Iona's trailer. Our shop's overhead cranes and giant scale were employed in this exercise. We look forward to see Mr. Anderson's meticulous transformation of this launch.
Of course, I couldn't resist weighing Iona's boiler while full of water. It came in at an even 1,000 lbs. This is good; we feared that we would have to ballast Iona's box keel with some lead pigs. This weight takes care of that.
Here's a last shot of the test gauge - sort of a blurry camera phone image - sitting just below 300 psi.
Gratification.
Saturday, March 29, 2014
Penance II
Some folks wanted to see beading in action. I'm taking a break this morning - I'm not as fast as I once was - so I thought I'd post a short video of flaring and then beading ...
Flaring:
And beading:
When I was younger, I could do an entire array of tubes, 250 or so, in a shift. Now, I'll be fortunate to wrap up this small array in a Saturday ...
Flaring:
And beading:
When I was younger, I could do an entire array of tubes, 250 or so, in a shift. Now, I'll be fortunate to wrap up this small array in a Saturday ...
Saturday, March 22, 2014
Penance
This is Lent, when popularly, it is thought that one should be giving something up, as in, "I gave up peanut butter for Lent." As I understand it from the ancients, though, it was about cultivating a deeper desire for Christ, not necessarily giving something up. Appended to this was the idea of penance ...
Now anyone who has undertaken to build a boat is familiar with penance and suffering ...
The winter was long and deep. In addition, a trip was made to South America, other responsibilities and vocations were attended to. Time in the boiler shop was scarce. I could not spend as much time on the launch as I desired. The spouse became worried as neurosis set in. But today dawned warmer with a hint of Spring, and I was free to work in the shop.
As you may recall, faithful reader, I am building three boilers - one for myself and two for friends. The one was just ninety some tube-beadings away from its hydro-static test. And so, thinking about my sins and shortcomings, I picked out a flaring and beading tool, hefted Cletus from the air gun rack and made penance on the tube sheet.
Cletus and I are old friends. He is thirty-five years old. Together, we must have beaded over hundreds of tubes in six different locomotives; some repeated re-tubings. Cletus has a slow, long stroke that when throttled is gentle when starting the tube roll, but can build to a chain-gun crescendo when putting the final polish on the roll.
To illustrate all of this for the uninitiated, here are some illustrations:
An array of tubes (not mine); some flared and some beaded:

The beading tool:

A boilermaker (no acquaintance), beading tubes with an air gun (not Cletus):

So, after a slow, thunderous morning and afternoon, I finished the one boiler. I ache and there are few busted knuckles, but my soul is purged and free. The result from the camera-phone, still flecked with bits of Crisco.
Quiéscite ágere pervérse, díscite benefácere: quærite iudícium, subveníte opprésso, iudicáte pupíllo, deféndite víduam. Et veníte et iudício contendámus, dicit Dóminus.
Now anyone who has undertaken to build a boat is familiar with penance and suffering ...
The winter was long and deep. In addition, a trip was made to South America, other responsibilities and vocations were attended to. Time in the boiler shop was scarce. I could not spend as much time on the launch as I desired. The spouse became worried as neurosis set in. But today dawned warmer with a hint of Spring, and I was free to work in the shop.
As you may recall, faithful reader, I am building three boilers - one for myself and two for friends. The one was just ninety some tube-beadings away from its hydro-static test. And so, thinking about my sins and shortcomings, I picked out a flaring and beading tool, hefted Cletus from the air gun rack and made penance on the tube sheet.
Cletus and I are old friends. He is thirty-five years old. Together, we must have beaded over hundreds of tubes in six different locomotives; some repeated re-tubings. Cletus has a slow, long stroke that when throttled is gentle when starting the tube roll, but can build to a chain-gun crescendo when putting the final polish on the roll.
To illustrate all of this for the uninitiated, here are some illustrations:
An array of tubes (not mine); some flared and some beaded:
The beading tool:
A boilermaker (no acquaintance), beading tubes with an air gun (not Cletus):
So, after a slow, thunderous morning and afternoon, I finished the one boiler. I ache and there are few busted knuckles, but my soul is purged and free. The result from the camera-phone, still flecked with bits of Crisco.
Quiéscite ágere pervérse, díscite benefácere: quærite iudícium, subveníte opprésso, iudicáte pupíllo, deféndite víduam. Et veníte et iudício contendámus, dicit Dóminus.
Sunday, December 1, 2013
Rolling in the Tubes
After some little housekeeping items on the boiler such as chasing threads on the nozzles and cleaning weld-splatter off of hand holes, it was time to prepare for setting the tubes. Tubes were ordered from Anderson Tube in Hatfield, PA, and the tube sheets were prepared by lightly sanding the holes radially. Unlike larger boilers where a one-inch variance in tube lengths is not uncommon, all of these holes were within 0.062" of each other, so I cut all of the tubes to the same length.
Tube rolling or expansion is an art far beyond this blogspace. If you would like to read more about the technical aspects of it, click here. In short, it involves expanding the tube into the fixed space of the sheet. Engineers would say that we want to end up with the tube plastic and the sheet holes and ligaments elastic. After rolling in thousands of tubes in this brief life, there's still a certain thrill to it because it is one of those few areas left to artificers where the ideal balance between over-rolling or under-rolling is a matter of feel.
Here, we're looking at the combustion chamber or back end of the boiler, and the first eleven tubes are rolled in. The particular expander I'm using has a flaring feature, which I'll explain more about another day. The goop in the holes is Crisco and while attributing their fine product, I'm sure lubricating tube expanders is something they would not like to be associated with. But it does the job and doesn't interfere with the heat-transfer welding that comes later. In some of the holes, one can see the degree that the tube has expanded. The goop makes the transition look larger than it is - we want this transition to be gradual without sharp edges. (By the way, some measurements for you technical types: The holes were bored 1.531", the tubes are 1.50" with 0.095" wall thickness.)
I manipulated the expander by hand, using a T-handle. That way there wasn't a lot of racket and I could be in my quiet, happy place, feeling the moment of set. In addition to feel, one sign of a good tube set in sheets this thin (0.375") is just when the mill scale on the sheet right around the hole begins to split into a micro lattice. If you look at the photo, this lacing appears as a thin, lighter halo around some of the tubes. That can occur within a sixteenth of a revolution of the expander, so one has to be alert.
The next blog entry will treat flaring and beading the tubes on the front (smokebox) end, and heat-transfer welds on the back (combustion chamber) end.
Tube rolling or expansion is an art far beyond this blogspace. If you would like to read more about the technical aspects of it, click here. In short, it involves expanding the tube into the fixed space of the sheet. Engineers would say that we want to end up with the tube plastic and the sheet holes and ligaments elastic. After rolling in thousands of tubes in this brief life, there's still a certain thrill to it because it is one of those few areas left to artificers where the ideal balance between over-rolling or under-rolling is a matter of feel.
Here, we're looking at the combustion chamber or back end of the boiler, and the first eleven tubes are rolled in. The particular expander I'm using has a flaring feature, which I'll explain more about another day. The goop in the holes is Crisco and while attributing their fine product, I'm sure lubricating tube expanders is something they would not like to be associated with. But it does the job and doesn't interfere with the heat-transfer welding that comes later. In some of the holes, one can see the degree that the tube has expanded. The goop makes the transition look larger than it is - we want this transition to be gradual without sharp edges. (By the way, some measurements for you technical types: The holes were bored 1.531", the tubes are 1.50" with 0.095" wall thickness.)
I manipulated the expander by hand, using a T-handle. That way there wasn't a lot of racket and I could be in my quiet, happy place, feeling the moment of set. In addition to feel, one sign of a good tube set in sheets this thin (0.375") is just when the mill scale on the sheet right around the hole begins to split into a micro lattice. If you look at the photo, this lacing appears as a thin, lighter halo around some of the tubes. That can occur within a sixteenth of a revolution of the expander, so one has to be alert.
The next blog entry will treat flaring and beading the tubes on the front (smokebox) end, and heat-transfer welds on the back (combustion chamber) end.