Sunday, June 1, 2014

Engine Beds

While waiting for the official boiler inspection to come around on the calendar, work continues apace on the hull.  The first photo shows the hull higher up on boat stands.  With rudder, skeg and propeller work in the near future, I needed to get the hull higher off the shop floor -


Spiders and silverfish were sent scurrying as the engine lift raised first one end and then the other as I followed with the jackstands.  The previous weekend I had gotten the engine beds out of some old-growth Doug fir I had lying around - actually leftovers from the stem piece.  Here, my heart is in my throat as I lift the uncompleted compound over the gunwales and down to the beds:


The object of the exercise is to dial in the fit for the propeller shaft.  Once the shaft is installed, further fitting of the beds may be pursued.  The engine swings down into place ...


The tenons of the beds are plainly seen in No. 3 floor.  The beds are just sitting in there since they will have to be planed and jiggered quite a bit.  Almost there ...


Ahh ...


Once on the beds, I get to work sliding the engine aft and positioning the story stick in the shaft log for calculating coupling lengths, propeller clearances, etc.  How does SAE 755 go again?  So much to remember ...  Here's a shot of the stick in place and my rule checking on clearances for the engine pumps.  I had planned for all of this previously when laying out the shaft log angle, bed supports, etc.  Still it is gratifying to see it all work out with the actual hardware.  At this point, the beds are still 0.125" high from the plane of the shaft log.  Pitch and roll on the beds remains to be dialed in, too.



The starboard bed is too thick and does not permit much lateral adjustment.  The engine is hoisted to take weight, out comes the plane and then the bed is tapped back into place.  Good, now there's more room.  The story stick has been replaced by a 1.25" dowel just to see how far we're off.  Final adjustment won't come until the shaft and couplings are in place, with a final review afloat in case the hull flexes in displacement.




Sunday, May 4, 2014

Putting on the Squeeze

I thought the day would never get here.  I am referring of course to the hydrostatic test of Iona's boiler.  A boiler needs to hold pressure and do so without leaking.  Steam leaks are pesky, debilitating things.  Plus on Inspection Day, the Authorized Inspector wants to see a vessel quietly sitting there holding 150 percent of working pressure, without fuss.

The boiler was set up on pipe horses and the various fittings and hydrostatic pump applied.  The furnace received heat for the first time in the form of an oxy-acetylene torch in order to bring vessel and water temperature up to 70 F.


Here's the boiler front with a vent fitting on the starboard lower 1.5" washout plug hole.  The port lower handhole fitting is seen to the right.  The boiler is sitting here with 300 psi on it.  I am pleased ...  The boiler is in the august company of a main driving wheelset for a ten-wheeler, for those who must know.


The combustion chamber end had three weepers, hence the puddle.  They quickly took up with a few turns of the tube roller.

Meanwhile, as the vessel was sitting there, I assisted colleague Mr. Anderson with his new launch ...


This is a Baird hull that Mr. Anderson acquired.  We were finding its center of gravity for a trailer he wants built for it.  The plan is then, that the trailer it is sitting on will become Iona's trailer.  Our shop's overhead cranes and giant scale were employed in this exercise.  We look forward to see Mr. Anderson's meticulous transformation of this launch.

Of course, I couldn't resist weighing Iona's boiler while full of water.  It came in at an even 1,000 lbs.  This is good; we feared that we would have to ballast Iona's box keel with some lead pigs.  This weight takes care of that.

Here's a last shot of the test gauge - sort of a blurry camera phone image - sitting just below 300 psi.

Gratification.


Saturday, March 29, 2014

Penance II

Some folks wanted to see beading in action.  I'm taking a break this morning - I'm not as fast as I once was - so I thought I'd post a short video of flaring and then beading ...

Flaring:


And beading:


When I was younger, I could do an entire array of tubes, 250 or so, in a shift.  Now, I'll be fortunate to wrap up this small array in a Saturday ...

Saturday, March 22, 2014

Penance

This is Lent, when popularly, it is thought that one should be giving something up, as in, "I gave up peanut butter for Lent."  As I understand it from the ancients, though, it was about cultivating a deeper desire for Christ, not necessarily giving something up.  Appended to this was the idea of penance ...

Now anyone who has undertaken to build a boat is familiar with penance and suffering ...

The winter was long and deep.  In addition, a trip was made to South America, other responsibilities and vocations were attended to.  Time in the boiler shop was scarce.  I could not spend as much time on the launch as I desired.  The spouse became worried as neurosis set in.  But today dawned warmer with a hint of Spring, and I was free to work in the shop.

As you may recall, faithful reader, I am building three boilers - one for myself and two for friends.  The one was just ninety some tube-beadings away from its hydro-static test.  And so, thinking about my sins and shortcomings, I picked out a flaring and beading tool, hefted Cletus from the air gun rack and made penance on the tube sheet.

Cletus and I are old friends.  He is thirty-five years old.  Together, we must have beaded over hundreds of tubes in six different locomotives; some repeated re-tubings.  Cletus has a slow, long stroke that when throttled is gentle when starting the tube roll, but can build to a chain-gun crescendo when putting the final polish on the roll.

To illustrate all of this for the uninitiated, here are some illustrations:

An array of tubes (not mine); some flared and some beaded:



The beading tool:



A boilermaker (no acquaintance), beading tubes with an air gun (not Cletus):



So, after a slow, thunderous morning and afternoon, I finished the one boiler.  I ache and there are few busted knuckles, but my soul is purged and free.  The result from the camera-phone, still flecked with bits of Crisco.

Quiéscite ágere pervérse, díscite benefácere: quærite iudícium, subveníte opprésso, iudicáte pupíllo, deféndite víduam. Et veníte et iudício contendámus, dicit Dóminus.



Sunday, December 1, 2013

Rolling in the Tubes

After some little housekeeping items on the boiler such as chasing threads on the nozzles and cleaning weld-splatter off of hand holes, it was time to prepare for setting the tubes.  Tubes were ordered from Anderson Tube in Hatfield, PA, and the tube sheets were prepared by lightly sanding the holes radially.  Unlike larger boilers where a one-inch variance in tube lengths is not uncommon, all of these holes were within 0.062" of each other, so I cut all of the tubes to the same length.

Tube rolling or expansion is an art far beyond this blogspace.  If you would like to read more about the technical aspects of it, click here.  In short, it involves expanding the tube into the fixed space of the sheet.  Engineers would say that we want to end up with the tube plastic and the sheet holes and ligaments elastic.  After rolling in thousands of tubes in this brief life, there's still a certain thrill to it because it is one of those few areas left to artificers where the ideal balance between over-rolling or under-rolling is a matter of feel.


Here, we're looking at the combustion chamber or back end of the boiler, and the first eleven tubes are rolled in.  The particular expander I'm using has a flaring feature, which I'll explain more about another day.  The goop in the holes is Crisco and while attributing their fine product, I'm sure lubricating tube expanders is something they would not like to be associated with.  But it does the job and doesn't interfere with the heat-transfer welding that comes later.  In some of the holes, one can see the degree that the tube has expanded.  The goop makes the transition look larger than it is - we want this transition to be gradual without sharp edges.  (By the way, some measurements for you technical types:  The holes were bored 1.531", the tubes are 1.50" with 0.095" wall thickness.)

I manipulated the expander by hand, using a T-handle.  That way there wasn't a lot of racket and I could be in my quiet, happy place, feeling the moment of set.  In addition to feel, one sign of a good tube set in sheets this thin (0.375") is just when the mill scale on the sheet right around the hole begins to split into a micro lattice.  If you look at the photo, this lacing appears as a thin, lighter halo around some of the tubes.  That can occur within a sixteenth of a revolution of the expander, so one has to be alert.

The next blog entry will treat flaring and beading the tubes on the front (smokebox) end, and heat-transfer welds on the back (combustion chamber) end.

Saturday, November 16, 2013

Stress Relieved

Here's a shot of the boiler front after stress relieving.  Doesn't it look more relaxed?  Now on to boring two washout plug holes.  The tubes were ordered yesterday.  The activity in the picture foreground is the layout and design for the firedoor ring and the smokebox.

Saturday, November 9, 2013

Ready for the Oven

I remembered the camera this morning before leaving for the shop, which is better than that moment when one thinks, "This would make a nice picture."  First, both sheets received their chamfer at the stay holes for the welding out of the stays.  We have a special 37º bit for the Carlton drill press that makes short work of this.  The stay material was cut to length and before I knew it, the back end was ready for the stress-relieving.  Here's a shot of the back end.  The ends of the stays that were just welded out are the three shiny buttons:


Then the boiler was flipped on its back and the stays welded in on the front.  This might be a good time to explain the other things we're seeing in the photos.  The lifting chain in both photos is threaded through the tube sheets.  The tubes will be rolled into these holes after stress-relieving the boiler.  The big nozzle at the bottom of both pictures is one of two hand holes for inspection, washing, etc.  Think of it as a window into the boiler's soul.  The smaller nozzle in the bottom of the picture, below, is the fitting for the boiler's blowdown.  The boiler is drained through the blowdown.  Crud can also be blown out the blowdown during operation.  This is done to the greatest visual effect by placing the blowdown through-hull fitting on the hull just above the water line.  After this second photo, I give a brief description of stress-relieving.


Welding is a fusion and metal deposition process.  As such, uneven stresses can build up in the pieces being welded and in the weld itself.  With a small boiler such as this one, we have the luxury of placing the whole assembly into an oven and raising the temperature for an extended period of time until about 90% of the stress is relieved.  Think of it as a nice soak in the tub after working hard in your garden or shop.  Not all of life may be mended, but emerging sanguine in complexion and disposition leaves one more fit to be around.  The boiler feels the same way.  For those who need to know, this fuller explanation from Houston Heat Treat, below:
Stress-relief operations are typically done by subjecting the parts to a temperature approximately 40- 75ºC (105-165ºF) below the Ac1 transformation temperature — about 727ºC (1340ºF) for steel.  Stress relief is typically performed for carbon steel at approximately 500-650ºC (930-1200ºF). The elimination of stress is not instantaneous (that is, the process is a function of both temperature and time).  To achieve the maximum benefit, some time at temperature (typically one hour per 25 mm of cross-sectional area once the part has reached temperature) is required.  This removes more than 90% of the internal stresses.
And a handy diagram lifted from Wikipedia, below, shows the A1 line.  Aren't steam launches an education?